Long Island Zoning Laws for Dormers and Extensions: What You Should Know Before You Build

Planning to build a dormer or home extension on Long Island? Before you start dreaming of extra bedrooms or larger kitchens, it’s essential to understand how local zoning laws and permit regulations may affect your project. Long Island’s building codes vary by township, and ignoring the rules can cost you time, money, and legal headaches.

This blog covers the basics of what you need to know before moving forward with any home expansion in Nassau or Suffolk County.


Why Zoning Matters

Zoning regulations determine:

  • How far your structure can be from property lines (setbacks)

  • How tall your home can be

  • The percentage of your lot you can build on

  • Whether your home is in a historical or coastal flood zone

These rules impact whether a dormer or extension is feasible — and what type of addition you're allowed to build.

Common Zoning Considerations for Dormers

Dormers may seem like simple roof modifications, but in many Long Island towns, they are treated as habitable space additions, meaning they fall under the same regulations as traditional extensions.

Key issues include:

  • Height restrictions: Most towns have a cap on how tall your home can be.

  • Square footage limits: Increasing square footage may require updated building plans.

  • Egress requirements: Windows in dormers must meet safety and fire code standards.

  • Architectural review: Some townships require approval for exterior modifications to maintain the character of the neighborhood.

Key Regulations for Extensions

Building outward? You’ll need to review:

  • Setback requirements: How far your new structure must be from the street, neighboring properties, and rear yard.

  • Lot coverage limitations: In many towns, you can only build on a certain percentage of your lot (often 25-35%).

  • Septic system regulations: Especially in Suffolk County, increasing bedrooms may require a larger septic system.

  • Special permits: Some projects may require zoning board variances if they don’t comply with local code.

Permit Process Overview

  1. Hire an architect: Required for structural changes and planning submissions.

  2. Submit building plans to your local building department.

  3. Obtain permits before any construction begins.

  4. Schedule inspections during and after construction for final approval.

Each town has its own process — from Hempstead to Brookhaven — so working with professionals familiar with local codes is key to keeping your project on schedule.

What Happens If You Skip Permits?

Building without proper permits can result in:

  • Stop-work orders

  • Fines or penalties

  • Delays in resale (you may have to legalize the work later)

  • Possible tear-downs or forced removal

Local Townships with Varying Rules

Long Island has dozens of local governments, each with its own building codes. Here are just a few towns with their own regulations:

  • Town of Hempstead

  • Town of Oyster Bay

  • Town of Huntington

  • Town of Islip

  • Town of Brookhaven

  • Village of Patchogue

  • Village of Garden City

Always check with your town or village’s building department for the most current requirements.

Final Tip: Work With Experts Who Know Local Zoning